INORGANIC MATERIALS AND CERAMIC MATRIX COMPOSITES |
|
|
|
|
|
Progress on Pre-treatment Technology of Rubber Powder Modified Asphalt |
GAO Yingli1,2,*, LI Yunbo1,2, TIAN Weiwei1,2, ZHU Juncai1,2, LIAO Meijie1,2, WANG Shuo1,2
|
1 School of Traffic and Transportation Engineering, Changsha University of Science & Technology, Changsha 410114, China 2 Hunan Provincial Engineering Technology Research Center for Novel and Carbon Neutral Road Material, Changsha University of Science & Technology, Changsha 410114, China |
|
|
Abstract As an important means to improve the storage stability of rubber asphalt, pre-treatment technology has acquired widespread concern by domestic and international scholars. In order to timely summarize the new technology of rubber powder pre-treatment and systematically sort out the influence law and mechanism of different pre-treatment methods on the comprehensive performance of rubber powder modified asphalt. This article summarizes the core contents of existing related research and discusses the principle of pre-treatment technology to improve the performance of rubber powder modified asphalt, the development trend of key technologies from the perspectives of technical characteristics, comprehensive performance and micro-mechanism of pre-treatment methods. In the bulk modification methods, technology physical radiation method, mechanochemical extrusion method and microbial metabolism method in the process of rubber powder modification play the unique advantages of high efficiency and environmental protection modification, large-scale stable production and harmless environmental protection treatment. In the surface modification methods, solution soaking method, coupling activation method, plasma activation method and surface grafting activation method in the process of rubber powder modification show the optimization efficiency of basic surface modification, efficient interface integration, deep surface reconstruction and advanced functional construction. In the future, it will promote the development of rubber powder pretreatment technology to be efficient, environmentally friendly and intelligent, and achieve technological breakthroughs through innovative coupling methods, green technology and intelligent control.
|
Published: 10 May 2025
Online: 2025-04-28
|
|
|
|
1 Liu H, Cui Y, Wang Q D. China Resources Comprehensive Utilization, 2023, 41(10), 64 (in Chinese). 刘鹤, 崔燕, 王乾达. 中国资源综合利用, 2023, 41(10), 64. 2 Cui L P. China Tire Resources Recycling, 2022(5), 27 (in Chinese). 崔吕萍. 中国轮胎资源综合利用, 2022(5), 27. 3 Meng X H, Liu Q, Pan J J, et al. China Environmental Science, 2023, 43(S1), 376 (in Chinese). 孟献昊, 刘强, 潘京津, 等. 中国环境科学, 2023, 43(S1), 376. 4 Han D Y, Wang L, Guo P Z, et al. Journal of Changsha University of Science & Technology (Natural Science), 2024, 21(3) , 61(in Chinese). 韩大勇, 王亮, 郭朋召, 等. 长沙理工大学学报(自然科学版), 2024, 21(3) , 61. 5 Shi S. Construction & Design for Engineering, 2021(4), 87 (in Chinese). 石帅. 工程建设与设计, 2021(4), 87. 6 Xiao F P, Wang T, Wang J Y, et al. China Journal of Highway and Transport, 2019, 32(4), 73 (in Chinese). 肖飞鹏, 王涛, 王嘉宇, 等. 中国公路学报, 2019, 32(4), 73. 7 Guo Z Y, Shen G H, Wang X Y, et al. China Journal of Highway and Transport, 2012, 25(4), 22 (in Chinese). 郭朝阳, 沈国辉, 王喜燕, 等. 中国公路学报, 2012, 25(4), 22. 8 Kocak S, Kutay M E. Construction and Building Materials, 2020, 248, 118658. 9 Venudharan V, Biligiri K P, Das N C. Construction and Building Materials, 2018, 181, 455. 10 Li J, Yao S, Xiao F, et al. International Journal of Pavement Engineering, 2022, 23(3), 651. 11 Wang X, Fan Z, Li L, et al. Applied Sciences, 2019, 9(16), 3434. 12 Li T G, Qiao W Y, Wang Y, et al. Journal of Municipal Technology, 2023, 41(11), 207 (in Chinese). 李廷刚, 乔文耀, 王宇, 等. 市政技术, 2023, 41(11), 207. 13 Zhang X, Wang X, Wan C, et al. Construction and Building Materials, 2023, 362, 129777. 14 Rath P, Majidifard H, Jahangiri B, et al. Transportation Research Record, 2021, 2675(10), 381. 15 Liu Q, Liu J, Yu B, et al. Construction and Building Materials, 2022, 314, 125676. 16 Dong C C. Comprehensive utilization of waste rubber resources, Chemical Industry Press, China, 2003, pp. 273 (in Chinese). 董诚春. 废橡胶资源综合利用, 化学工业出版社, 2003, pp. 273. 17 Colom X, Faliq A, Formela K, et al. Polymer Testing, 2016, 52, 200. 18 De-Sousa F D B, Scuracchio C H, Hu G H. Polymer Degradation and Stability, 2017, 138, 169. 19 Xu O, Li M, Hou D, et al. Construction and Building Materials, 2020, 256, 119440. 20 Zhao X W, Chen L, Xu T, et al. Highways and Transportation in Inner Mongolia, 2023(6), 30 (in Chinese). 赵旭武, 陈亮, 徐添, 等. 内蒙古公路与运输, 2023(6), 30. 21 Xu P, Gao J, Pei J, et al. Construction and Building Materials, 2021, 282, 122641. 22 Yin J, Wang S, Lv F. Construction and Building Materials, 2013, 49, 712. 23 Yang X, Shen A, Li B, et al. Journal of cleaner production, China, 2020, 248, 119230. 24 Duan H, Zhu C, Zhang H, et al. International Journal of Pavement Engineering, 2023, 24(1), 2164891. 25 Zhou T, Zhou J, Li Q, et al. Frontiers in Materials, 2020, 7, 603938. 26 Wu W, Jiang W, Xiao J, et al. Journal of Cleaner Production, 2022, 377, 134488. 27 Yao Z, Yang R, Shi J, et al. Construction and Building Materials, 2022, 342, 127862. 28 Sun L, Wen Y, Liu Q, et al. Construction and Building Materials, 2021, 313, 125409. 29 Li M, Xu O, Min Z, et al. Materials and Structures, 2023, 56(7), 117. 30 Liang M, Qiu Z, Luan X, et al. Frontiers in Materials, 2022, 9, 845718. 31 Liu W, Xu Y, Wang H, et al. Materials, 2021, 14(10), 2693. 32 Lushinga N, Dong Z, Cao L. Nanomaterials, 2022, 12(24), 4388. 33 Isayev A, Chen J, Tukachinsky A. Novel Ultrasonic Technology for Devulcanization of Waste Rubbers. Fall ACS Rubber Division Meeting Pittsburgh, PA, 1994, pp.86. 34 Feng W, Isayev A I. Polymer Engineering and Science, 2006, 46(1), 8. 35 Wang Q. Study on cavitation theory and multi-scale characteristics of ultrasonic assisted preparation of waste crumb rubber modified asphalt. Master’s Thesis, North University of China, China, 2023 (in Chinese). 王倩. 超声波辅助制备废胶粉改性沥青的空化理论及多尺度特性研究. 硕士学位论文, 中北大学, 2023. 36 Xu M, Liu J, LiW, et al. Journal of materials in civil engineering, 2015, 27(5), 04014173. 37 Zhang X P, Wei B F, Zhang H T, et al. China Rubber/Plastics Technology and Equipment, 2023, 49(6), 18 (in Chinese). 张小萍, 韦帮风, 张航天, 等. 橡塑技术与装备, 2023, 49(6), 18. 38 Zhao A D. Research of using a co-rotating twin-screw extruder to make devulcanized rubber and the properties of modified asphalt. Master’s Thesis, Beijing University of Chemical Technology, China, 2015 (in Chinese). 赵安东. 双螺杆挤出机制备脱硫橡胶及脱硫橡胶改性沥青的性能和机理研究. 硕士学位论文, 北京化工大学, 2015. 39 Wang J, Zhang Z, Li Z. Journal of Materials in Civil Engineering, 2020, 32(1), 04019330. 40 Dong R, Li J, Wang S. Journal of Materials in Civil Engineering, 2011, 23(8), 1138. 41 Cheng G, Shen B, Zhang J. Petroleum Science and Technology, 2011, 29(2), 192. 42 Li J, Xiao X, Chen Z, et al. Sustainable Materials and Technologies, 2022, 32, e00417. 43 Wang K, Kang Y. China Rubber/Plastics Technology and Equipment, 2017, 43 (3), 58 (in Chinese). 王坤, 康永. 橡塑技术与装备, 2017, 43 (3), 58. 44 Kabir S F, Zheng R, Delgado A G, et al. Resources, Conservation and Recycling, 2021, 164, 105144. 45 Ji K J, Yuan Z X, Chen Z X. Vulcanized rubber powder: principle, Technology and Application. Chemical Industry Press, China, 2016, pp. 64 (in Chinese). 纪奎江, 袁仲雪, 陈占勋. 硫化橡胶粉——原理·技术·应用, 化学工业出版社, 2016, pp. 64. 46 Badughaish A, Li J, Amirkhanian S, et al. Journal of Cleaner Production, 2022, 354, 131762. 47 Shatanawi K, Biro S, Thodesen C, et al. International Journal of Pavement Engineering, 2009, 10(4), 289. 48 Shatanawi K M, Biro S, Naser M, et al. Road Materials and Pavement Design, 2013, 14(3), 723. 49 Li J, Chen Z X, Xiao F P, et al. Journal of Materials in Civil Engineering, 2022, 34(1), 04021377. 50 Guo X X, Dou W J, Gu Y. China Rubber Industry, 2023, 70(8), 570 (in Chinese). 郭新霞, 窦文静, 顾尧. 橡胶工业, 2023, 70(8), 570. 51 Yu Z G, Liu L X. Tianjin Chemical Industry, 1997(3), 46 (in Chinese). 于忠贵, 刘连香. 天津化工, 1997(3), 46. 52 Song L, Jiang Y X. Chinese Journal of Chemical Education, 2020, 41(19), 103 (in Chinese). 宋琳, 姜言霞. 化学教育, 2020, 41(19), 103. 53 Shen Z C, Huang Y Y. Hunan Communication Science and Technology, 2017, 43(2), 4 (in Chinese). 申泽春, 黄云艳. 湖南交通科技, 2017, 43(2), 4. 54 Zhang Y, Liu Z, Peng J. Applied Sciences, 2019, 9(22), 4831. 55 Xiang Y, Fan H, Liu Z. Construction and Building Materials, 2020, 236, 117600. 56 Zheng S L, Wang C L, Li C Q. Powder surface modification, China Building Materials Industry Press, China, 2019 (in Chinese). 郑水林, 王彩丽, 李春全. 粉体表面改性, 中国建材工业出版社, 2019. 57 Liu L, Liu Z H, Xiang Y, et al. Journal of Building Materials, 2017, 20(1), 150 (in Chinese). 柳力, 刘朝晖, 向宇, 等. 建筑材料学报, 2017, 20(1), 150. 58 Cao W D, Liu S T, Fang J G, et al. Journal of Building Materials, 2009, 12(4), 497 (in Chinese). 曹卫东, 刘树堂, 房建果, 等. 建筑材料学报, 2009, 12(4), 497. 59 Yan T Y. Study on the performance of coupling modified crumb rubber/steel slag powder composite modified asphalt mastic and asphalt mixture. Master’s Thesis, Guangxi University, China, 2022 (in Chinese). 颜添毅. 偶联改性橡胶粉/钢渣粉复合改性沥青胶浆及其混合料性能研究. 硕士学位论文, 广西大学, 2022. 60 Krasnoslobodtsev A V, Smirnov S N. Langmuir, 2002, 18(8), 3181. 61 Kallury K M, Macdonald P M, Thompson M. Langmuir, 1994, 10(2), 492. 62 Xiao F P, Zong Q D, Chen J, et al. China Journal of Highway and Transport, 2019, 32(4), 170 (in Chinese). 肖飞鹏, 宗启迪, 陈军, 等. 中国公路学报, 2019, 32(4), 170. 63 Fanelli F, Fracassi F. Surface and Coatings Technology, 2017, 322, 174. 64 Schutze A, Jeong J Y. IEEE transactions on plasma science, 1998, 26(6), 1685. 65 You F B. Performance study on waste tire crumb rubber modified asphalt activated by low temperature plasma. Master’s Thesis, Suzhou University of Science and Technology, China, 2015 (in Chinese). 尤凤兵. 低温等离子体活化废旧轮胎橡胶粉改进沥青性能研究. 硕士学位论文, 苏州科技学院, 2015. 66 Mao Y M. Performance of EVA/CRM modified asphalt prepared at low temperature plasma. Master’s Thesis, Suzhou University of Science and Technology, China, 2021 (in Chinese). 茆一鸣. 低温等离子体活化EVA/废胶粉复配改性沥青制备及其性能研究. 硕士学位论文, 苏州科技大学, 2021. 67 Wang X, Hong L, Wu H, et al. Construction and Building Materials, 2021, 271, 121881. 68 Liu B, Li J, Han M, et al. Construction and Building Materials, 2020, 238, 117737. 69 Xie J, Yang Y, Lv S, et al. Materials, 2019, 12(12), 2014. 70 Xie J, Yang Y, Lv S, et al. Polymers, 2019, 11(10), 1563. 71 Yang Y M. Investigation on the preparation and performance of modified asphalt based on the grafting activation of crumb rubber. Master’s Thesis, Changsha University of Science & technology, China, 2020 (in Chinese). 阳月明. 接枝活化废胶粉改性沥青的制备及性能研究. 硕士学位论文, 长沙理工大学, 2020. 72 Kocevski S, Yagneswaran S, Xiao F, et al. Construction and Building Materials, 2012, 34, 83. 73 Kumar A, Choudhary R. Construction and Building Materials, 2024, 419, 135558. 74 Yu G, Li Z M, Zhou X, et al. Petroleum Science and Technology, 2011, 29(4), 411. 75 Kuang D L, Kang B D, Liu W C, et al. Highway, 2021, 66(11), 305 (in Chinese). 况栋梁, 康秉铎, 刘文昌, 等. 公路, 2021, 66(11), 305. 76 Liu L, Liu Z, Yang C. Advances in Materials Science and Engineering, 2021, 2021, 1. 77 Hosseinnezhad S, Kabir S F, Oldham D J, et al. Journal of Cleaner Production, 2019, 225, 82. 78 Kabir S F, Mousavi M A, Fini E H. Journal of Cleaner Production, 2020, 252, 119856. 79 Mousavi M, Hosseinnezhad S, Kabir S F, et al. Resources, Conservation and Recycling, 2019, 149, 292. |
|
|
|